- projects
Jordan – High-Capacity Water Treatment System (Process Water Recovery)
About the Project
Water scarcity is one of the greatest challenges in the Middle East. N-thalpie is currently implementing a demanding project in Jordan for the treatment of contaminated industrial wastewater and the recirculation of purified water back into the process.
System Capacity
- Treatment of 14 tonnes of contaminated water per hour
- Removal of:
- High salt concentrations
- Suspended solids
- Conductivity-causing ions
- Production of reusable process water through:
- Evaporation
- Condensation
- Solid separation
- Conductivity control
Engineering Services by N-thalpie
- Complete thermodynamic analysis
- Finite element simulations
- Mechanical design and engineering of all components
- Delivery of a turnkey engineering package to the client
Project Progress
- Manufacturing and system integration fully coordinated by the N-thalpie engineering team
- Planned on-site commissioning in 2026, including:
- Construction and installation supervision
- Commissioning
- Start-up operation
- Final system validation
Result
The system significantly reduces water consumption in a region facing acute water scarcity and therefore makes an important contribution to more sustainable industrial water use.
Contact Us
Would you like to learn more about our solutions?
We would be pleased to discuss technical requirements, feasibility and possible implementation steps with you.
Direct Contact with Our Experts
Whether you have an initial idea or a specific project in mind, we support you in the evaluation process and show you how we can provide technical support.
Hafenstraße 38
DE-31137 Hildesheim